|
|
|
[
Permlink
| « Hide
]
Robin Shen [25/Feb/11 02:12 PM]
Never mind. I reproduced the issue.
Hi Josef,
I can not be able to reproduce the issue with your described scenario. Can you please send database backup to support@pmease.com, with instructions on how to reproduce the issue (especially which 3 builds to run) Thanks Robin Hi Josef,
Does these running builds depend on each other, in the form of one build triggering another build, or checking out artifacts from another build. In this case QB will consider them as a single build. This is reasonable from resource usage perspective, as waiting builds are not using any resources although their status is RUNNING. Regards Robin |