| << Back to previous view |
[QB-674] Build notifications not working when using the following setup
|
|
| Status: | Resolved |
| Project: | QuickBuild |
| Component/s: | None |
| Affects Version/s: | 3.0.11 |
| Fix Version/s: | 3.0.12 |
| Type: | Bug | Priority: | Major |
| Reporter: | Roger Perkins | Assigned To: | Unassigned |
| Resolution: | Fixed | Votes: | 0 |
| Remaining Estimate: | Unknown | Time Spent: | Unknown |
| Original Estimate: | Unknown | ||
| Description |
|
The setup I have is (I'm expecting a mail every time the build fails and on the first successful build following that):
If one of specified criterias is satisfied Criterias Criteria If build is successful and current is failed If build is failed I create a new configuration with myself with the above conditions. I set the master step to be a "dummy" and run, the build is successful (no mail received or expected). I change the dummy to a fail step (mail received as expected). I change the step back to a dummy, build succeeds (no mail as I would expect). Should the condition I should be able to choose not be "If build is successful and previous is failed" ? |
| Comments |
| Comment by Robin Shen [ 12/Oct/10 11:27 PM ] |
|
The name is misleading, we will fix below names:
if build is successful and current is failed -> if previous build is successful and current is failed if build is failed and current is successful -> if previous build is failed and current is successful So in your case, please choose the second condition. |