History | Log In     View a printable version of the current page.  
Issue Details (XML | Word | Printable)

Key: QB-2481
Type: Improvement Improvement
Status: Open Open
Priority: Major Major
Assignee: Robin Shen
Reporter: Andrzej Zabost
Votes: 9
Watchers: 1
Operations

If you were logged in you would be able to see more operations.
QuickBuild

Calculate SCM changes report using last successful build

Created: 02/Jul/15 08:01 AM   Updated: 02/Jul/15 11:09 PM
Component/s: None
Affects Version/s: None
Fix Version/s: None

Original Estimate: Unknown Remaining Estimate: Unknown Time Spent: Unknown


 Description  « Hide
Hi,
My team needs SCM changes reports calculated from previous successful build. Currently it is calculated from previous build, which makes SCM changes disappear when we trigger build again after failed build.
Could you please add this possibility?

 All   Comments   Work Log   Change History      Sort Order:
Robin Shen [02/Jul/15 11:09 PM]
QB always calculates changes since previous previous as otherwise features such as SCM statistics will be inaccurate. However you can still have QB displaying changes since previous successful build by specifying the compare with option at right top side of the scm changes page.