|
|
|
[
Permlink
| « Hide
]
Justin Georgeson [29/Apr/14 08:47 PM]
A manual trigger will fail and the subsequent scheduled trigger will succeed. Manually trigger again but cancel the build (status CANCELLED), and the schedule will not trigger a rebuild. Change the timeout on the sleep step to timeout before the sleep returns then manually trigger (status TIMEDOUT) and the schedule will not trigger a rebuild.
Thanks for reporting this. Will get it addressed in next patch release.
|