|
|
|
[
Permlink
| « Hide
]
Robin Shen [20/Jan/12 12:30 AM]
This is by design, since resource is calculated dynamically at the time of assigning step to node, it can not be used in other places. For instance, if we allow to select resources in the repeat parameter, how about the resource being acquired by other steps when a step instance actually runs.
|